What's included
- Custom & semi-custom cabinetry
- Quartz countertops
- Open-concept layouts
- Farmhouse sinks
- Recessed lighting
- Updated electrical systems
- Soft-close drawers and hinges
- Updated plumbing systems
Older houses and newer houses renovate differently
In an older Richmond Hill house, opening up a kitchen can uncover past alterations, older wiring, or plumbing that has to be brought up to code before new cabinets go in, and some original details are worth keeping. In a newer house the work is more often about storage, a bigger island, and finishes that match the rest of the home. We start from the house you have, not a template.
Kitchen permits in Richmond Hill
The City of Richmond Hill says a building permit is needed to alter a building, including its plumbing or HVAC, and that constructing kitchen cupboards doesn’t need one. So new cabinets in the same layout are a different case from relocating the sink, rerouting a range hood duct, or removing a wall. The city takes residential permit applications online, and its zoning by-laws apply even when no permit is required. We work out which applies before the schedule is set.
One plan when the kitchen is part of a bigger job
When the kitchen is part of a bigger job, such as a bathroom, a finished basement, or an addition, planning them together means walls are opened once, plumbing and electrical are run once, and stone, cabinetry, fixtures, and lighting are ordered to arrive in the right sequence. On its own, a full kitchen usually takes four to eight weeks on site.
Related renovation resources
Kitchen renovation in Toronto and the GTA
Our full kitchen renovation service: layouts, cabinetry, counters, permits, and scheduling.
Read moreHome renovation and additions in Richmond Hill
Additions, whole-home remodeling, and everything else we build in Richmond Hill.
Read moreBathroom renovation in Richmond Hill
Ensuites, main bathrooms, and tub-to-shower conversions built on proper waterproofing.
Read moreBasement renovation in Richmond Hill
Finished basements planned around the mechanical room, drains, and city permits.
Read morePlanning references
- City of Richmond Hill: Building permit FAQs
- City of Richmond Hill: Residential permits
- Electrical Safety Authority: Notifications and inspections
Requirements can change. Confirm the current rules for the property and proposed scope before work begins.
Before & after
Kitchen renovation in Scarborough, 2025. Scope: full gut and new layout.
Before-and-after photos from our own renovation projects.


Frequently asked questions
Do I need a permit to renovate a kitchen in Richmond Hill?
Not for every kitchen. The City of Richmond Hill says building kitchen cupboards doesn’t need a permit, but altering plumbing, HVAC, or the structure does. If your plan moves the sink, changes ventilation, or takes out a wall, we prepare the drawings and apply for you.
Can you renovate the kitchen as part of an addition or whole-home remodel?
Yes. We build home additions and whole-home remodels in Richmond Hill, and planning the kitchen with the rest of the work keeps the structure, services, and finishes in one written scope and schedule.
How long does a kitchen renovation take in Richmond Hill?
Usually four to eight weeks of on-site work for a full kitchen, plus design and cabinetry lead time beforehand. A kitchen inside a larger remodel follows the overall construction sequence, which we lay out in writing.



