What's included
- Custom showers
- Soaking tubs
- Reconfigured layouts
- Soft-close drawers & hinges
- Quality fixtures
- Tile and flooring
- Updated electrical systems
- Modern lighting
Showers, tubs, and layouts
Tub-to-shower conversions, curbless walk-in showers, freestanding tubs, and double vanities. We can reconfigure the layout to gain space without moving exterior walls.
The work behind the tile
Membrane waterproofing behind the tile, a proper slope to the drain, exhaust fans vented outside, and optional heated floors. This is the part that decides how long a bathroom lasts, so we do not cut corners on it.
Older-home plumbing, handled
Galvanized supply lines, past renovations that were done badly, and low water pressure are common in older Toronto homes. We update the plumbing and electrical to current code as part of the renovation.
Related renovation resources
Before & after
Before-and-after photos from our own renovation projects.


Frequently asked questions
How long does a bathroom renovation take in Toronto?
Most full bathroom renovations take two to four weeks on site. If you only have one bathroom, we give you a day-by-day schedule so you can plan around the downtime.
Can you convert my tub to a walk-in shower?
Yes. We handle the demolition, plumbing, waterproofing, tile, and glass for a tub-to-shower conversion as one package.
Do you install heated bathroom floors?
Yes. Electric in-floor heating adds comfort for a modest cost during a renovation. We wire it on a dedicated circuit with a programmable thermostat, and it is ESA-inspected.
How do you prevent mould and leaks?
Membrane waterproofing behind the tile, correct slopes, sealed penetrations, and exhaust fans that vent outside rather than into the attic. That is the difference between a bathroom that lasts a few years and one that lasts decades.


