What's included
- Custom & semi-custom cabinetry
- Quartz countertops
- Open-concept layouts
- Farmhouse sinks
- Recessed lighting
- Updated electrical systems
- Soft-close drawers and hinges
- Updated plumbing systems
Layouts built for real Toronto homes
Older Toronto houses come with their own issues, like a load-bearing wall between the kitchen and dining room, or knob-and-tube wiring above the ceiling. We plan for these before we start, with structural drawings, ESA-licensed electrical, and permits filed with the city before demolition.
Cabinetry, counters, and finishes
Custom and semi-custom cabinetry, quartz or granite counters, tile or hardwood flooring, and a lighting plan to match. Soft-close drawers and hinges throughout, with storage sized to your space.
A schedule you can plan around
Most full kitchen renovations take four to eight weeks on site, depending on the scope and cabinetry lead times. You get a written schedule up front and one point of contact until the final walkthrough.
Related renovation resources
Kitchen renovation in Markham
Family kitchens planned for more than one generation, with City of Markham permits handled.
Read moreKitchen renovations in Scarborough
Kitchen work in Scarborough postwar homes, including our documented 2025 kitchen project.
Read moreKitchen renovation in Richmond Hill
Kitchens for older and newer Richmond Hill homes, on their own or within a larger remodel.
Read moreKitchen renovation in Vaughan
Builder-grade Vaughan kitchens replaced with custom cabinetry, bigger islands, and better lighting.
Read moreBefore & after
Kitchen renovation in Scarborough, 2025. Scope: full gut and new layout.
Before-and-after photos from our own renovation projects.


Frequently asked questions
How much does a kitchen renovation cost in Toronto?
It depends on the scope. A cosmetic refresh that keeps the existing layout costs far less than moving walls and services. After a free on-site visit, we give you an itemized written estimate so you can see where the budget goes before you commit.
Do I need a permit to renovate my kitchen in Toronto?
If the work involves moving walls, relocating plumbing, or adding electrical circuits, then yes. We prepare the drawings, file the permit with the City of Toronto or your local municipality, and coordinate the inspections as part of the job.
How long will my kitchen renovation take?
Usually four to eight weeks of on-site work for a full renovation, plus design and cabinetry lead time beforehand. We confirm a realistic schedule in writing before we start.
Can you open up a wall for an island or open-concept layout?
Yes, including load-bearing walls. We handle the structural engineering, beam installation, permits, and inspections that an open-concept conversion needs.



