What's included
- Custom showers
- Soaking tubs
- Reconfigured layouts
- Soft-close drawers & hinges
- Quality fixtures
- Tile and flooring
- Updated electrical systems
- Modern lighting
Ensuites with room to rethink
If your ensuite has space to work with, the options open up: a curbless walk-in shower in place of a tub that rarely gets used, a double vanity, a freestanding tub, or heated floors. We can reconfigure the layout to gain space without moving exterior walls.
When a Richmond Hill bathroom needs a permit
The City of Richmond Hill says a building permit is needed to alter plumbing or HVAC, while building bathroom cupboards doesn’t need one. A new vanity and tile in the same layout is a different job from moving the toilet, relocating the shower drain, or rerouting the exhaust. We review the plan against the city’s requirements and apply online when a permit is needed.
Planning around the downtime
Most full bathroom renovations take two to four weeks on site. If it’s the only full bathroom in the house, we give you a day-by-day schedule so you can plan around it. Electrical work for heated floors or new lighting is done by ESA-licensed electricians and inspected by the ESA.
Related renovation resources
Bathroom renovation in Toronto and the GTA
Our full bathroom service: showers, tubs, tile, waterproofing, and older-home plumbing.
Read moreHome renovation and additions in Richmond Hill
Additions, whole-home remodeling, and everything else we build in Richmond Hill.
Read moreKitchen renovation in Richmond Hill
Kitchens for older and newer Richmond Hill homes, on their own or within a larger remodel.
Read moreBasement renovation in Richmond Hill
Finished basements planned around the mechanical room, drains, and city permits.
Read morePlanning references
- City of Richmond Hill: Building permit FAQs
- Electrical Safety Authority: Notifications and inspections
Requirements can change. Confirm the current rules for the property and proposed scope before work begins.
Before & after
Before-and-after photos from our own renovation projects.


Frequently asked questions
Do I need a permit for a bathroom renovation in Richmond Hill?
Only for some. Replacing finishes and building cupboards in the same layout generally doesn’t need one, but the City of Richmond Hill requires a permit to alter plumbing or HVAC. Moving fixtures or changing ventilation usually means applying, and we handle that for you.
How long does a bathroom renovation take in Richmond Hill?
Most full bathroom renovations take two to four weeks on site, depending on the layout changes and the tile. We give you the schedule in writing before demolition.
Can you add a bathroom in the basement at the same time?
Yes. A basement bathroom is plumbing work that needs a permit, so it is easiest to plan with the rest of the job. Placement depends on where the existing drains run.


