Free estimate. Same-day reply.

replanthe whole main floor as one space

Main-floor renovation in Toronto, planned as one connected project

A main-floor renovation usually crosses the kitchen, dining and living areas, even when one room started the conversation. We plan the layout, structure, service routes, lighting, flooring, millwork and finishes together so the completed level works as one space.

Grey kitchen with a navy island open to the family room, illustrating a connected main floor

Our project

Licensedand insured in Ontario
ESAlicensed electrical trades
Permitsfiled and inspected by us
Freewritten, itemized estimate
The scope

What's included

  • Existing-condition and layout review
  • Kitchen, dining and living-space planning
  • Structural opening coordination
  • Building permit drawing coordination
  • Electrical, plumbing and HVAC planning
  • Flooring, stairs, trim and millwork
  • Temporary kitchen and access planning
  • One written scope and build sequence
01

Start with how the whole level needs to work

We document the entrances, stairs, windows, kitchen, dining area, living room, powder room, storage and routes to the yard before drawing a new plan. That reveals whether the real problem is a wall, a narrow work aisle, poor storage, a traffic path through the kitchen, or several smaller conflicts. The design can then concentrate construction where it changes daily use instead of removing every partition simply to make the floor look open.

02

Treat structural openings as part of the room design

Opening the kitchen to the dining or living area may affect joists, walls above, posts, beams and support below. We coordinate the existing-condition review and project-specific structural design where the load path changes. Beam depth, posts and bearing can influence cabinetry, lighting, bulkheads and furniture, so those decisions belong in the layout before finishes are selected. Temporary support, approved construction and required reviews are then sequenced before the old wall is removed.

03

Map services before the ceiling and walls are opened

Main-floor partitions often carry wiring, switches, plumbing vents, water lines, ducts, returns or gas piping. A new island can also need power, plumbing or ventilation in a different location. We plan known relocations with the appropriate trades and identify where selective investigation is needed. Electrical notification and inspection are separate from a municipal building permit, so the project schedule must allow each authority to review applicable work before it is concealed.

04

Coordinate the kitchen with every surface around it

Cabinet dimensions, appliance clearances, counter overhangs and lighting affect circulation well beyond the kitchen footprint. Flooring may cross the entire level; ceilings and trim may need wider repair after a wall comes out; paint colours change across connected sightlines. We set the kitchen, flooring, millwork, lighting and finish plans against the same dimensions so trades are not resolving conflicts after products have been ordered.

05

Put permits and inspection points into the sequence

The City of Toronto identifies adding or removing walls as a structural or material alteration that requires a building permit. Its interior-alteration guide asks for existing and proposed floor plans and structural framing information, with plumbing and HVAC documents where applicable. We confirm the approval path for the actual scope, coordinate the required documents, and keep regulated work accessible for the inspections that apply before drywall and finishes close it in.

06

Plan how the household will live around the work

A main-floor project can interrupt cooking, entries, stairs, washroom access and the path to occupied rooms. Before construction, we define the work zone, dust separation, material route, temporary kitchen expectations, service interruptions and any areas that cannot remain safely accessible. Staying in the house may be practical for some scopes and unrealistic for others. That decision should follow the actual demolition and service plan, not a generic promise.

07

Compare proposals by what happens outside the new kitchen

A complete proposal should identify design and permit responsibilities, protection, demolition, structural work, known trade relocations, cabinetry, counters, flooring, drywall, trim, paint, fixtures, disposal, inspections and closeout. It should also state allowances, exclusions and how concealed conditions or owner changes are approved. Ontario consumer guidance emphasizes written renovation contracts and written changes. We provide an itemized scope after reviewing the house so the price is tied to the work being proposed.

Planning references

Requirements can change. Confirm the current rules for the property and proposed scope before work begins.

Our work

Before & after

Kitchen renovation in Scarborough, 2025. Scope: full gut and new layout.

Before-and-after photos from our own renovation projects.

Main-Floor Renovation Toronto, after
Main-Floor Renovation Toronto, before
BeforeAfter

Drag to compare

FAQ

Frequently asked questions

Photo from one of our renovation projectsOur project
Main-Floor Renovations example (illustrative photo)
Main-Floor Renovations example (illustrative photo)
Main-Floor Renovations example (illustrative photo)
Our project

Photos without an “Our project” label are illustrative examples of finishes and layouts, not photographs of our work.

Booking estimates now

Ready to price your main-floor renovation?

Free on-site visit, a written itemized estimate, and one point of contact from the first walkthrough to the final inspection.