What's included
- Custom & semi-custom cabinetry
- Quartz countertops
- Open-concept layouts
- Farmhouse sinks
- Recessed lighting
- Updated electrical systems
- Soft-close drawers and hinges
- Updated plumbing systems
A kitchen for a multi-generational household
Markham homeowners often ask for bigger kitchens that work for more than one generation. Before we draw anything, we look at how your household cooks and eats: where a second prep area or a larger island fits, how much pantry storage you need, and whether the eating area should open to the family room. If the plan also includes an in-law suite downstairs, we design both kitchens together so the plumbing and electrical work is planned once.
Markham permits for kitchen work
Building permits here come from the City of Markham, not Toronto. The city’s permit guide lists wall removal as housing permit work and says a plumbing permit is needed for plumbing work inside a building, so a kitchen that takes out a wall or moves the sink usually needs one. When the plumbing is part of a larger permitted project, the guide says a separate plumbing permit isn’t required. Electrical work is done by ESA-licensed electricians and inspected by the ESA.
Materials ordered in the right order
Most full kitchen renovations take four to eight weeks on site, depending on the scope and cabinetry lead times. We settle cabinetry, stone, fixtures, and lighting early so they arrive when the crew needs them, and you get the schedule in writing before work starts. You keep one point of contact from the first visit to the final walkthrough.
Related renovation resources
Kitchen renovation in Toronto and the GTA
Our full kitchen renovation service: layouts, cabinetry, counters, permits, and scheduling.
Read moreHome renovation in Markham
Everything we renovate in Markham, from bathrooms to basements, in-law suites, and additions.
Read moreBasement renovation in Markham
Finished basements and in-law suites for Markham households, with permits and registration covered.
Read moreKitchen renovation cost: compare the scope
What changes the price of a kitchen renovation, and how to compare quotes line by line.
Read morePlanning references
- City of Markham: Guide to building permits
- City of Markham: Registration of basement apartments and second suites
- Electrical Safety Authority: Notifications and inspections
Requirements can change. Confirm the current rules for the property and proposed scope before work begins.
Before & after
Kitchen renovation in Scarborough, 2025. Scope: full gut and new layout.
Before-and-after photos from our own renovation projects.


Frequently asked questions
Do I need a permit for a kitchen renovation in Markham?
It depends on the scope. New cabinets and counters in the same layout is a smaller job than removing a wall or moving plumbing, and the City of Markham lists wall removal and plumbing work among the jobs that need a permit. We check your plan against the city’s requirements during the estimate and handle the application.
How long does a kitchen renovation in Markham take?
Usually four to eight weeks of on-site work for a full renovation, plus design and cabinetry lead time beforehand. We confirm a realistic schedule in writing before we start.
Can you build a second kitchen for an in-law suite?
Yes, as part of a basement or in-law suite project. A suite with its own kitchen needs proper egress, sound separation, and permitted plumbing and electrical. If it becomes a self-contained second unit, the City of Markham requires two-unit houses to be registered, with both units inspected. We plan for that before the design is final.



