Free estimate. Same-day reply.

reimagineyour Markham kitchen

Kitchen renovation in Markham

Kitchen renovation in Markham from HomeReframe Renovations is planned around how a family actually uses the room: space for more than one person cooking, storage sized to a bigger household, and an island or open layout where the structure allows it. One team handles the drawings, permits, trades, and finishing, from Unionville to Cornell.

Bright white kitchen with a marble-look island and black-framed garden doors

Illustrative photo

Licensedand insured in Ontario
ESAlicensed electrical trades
Permitsfiled and inspected by us
Freewritten, itemized estimate
The scope

What's included

  • Custom & semi-custom cabinetry
  • Quartz countertops
  • Open-concept layouts
  • Farmhouse sinks
  • Recessed lighting
  • Updated electrical systems
  • Soft-close drawers and hinges
  • Updated plumbing systems
01

A kitchen for a multi-generational household

Markham homeowners often ask for bigger kitchens that work for more than one generation. Before we draw anything, we look at how your household cooks and eats: where a second prep area or a larger island fits, how much pantry storage you need, and whether the eating area should open to the family room. If the plan also includes an in-law suite downstairs, we design both kitchens together so the plumbing and electrical work is planned once.

02

Markham permits for kitchen work

Building permits here come from the City of Markham, not Toronto. The city’s permit guide lists wall removal as housing permit work and says a plumbing permit is needed for plumbing work inside a building, so a kitchen that takes out a wall or moves the sink usually needs one. When the plumbing is part of a larger permitted project, the guide says a separate plumbing permit isn’t required. Electrical work is done by ESA-licensed electricians and inspected by the ESA.

03

Materials ordered in the right order

Most full kitchen renovations take four to eight weeks on site, depending on the scope and cabinetry lead times. We settle cabinetry, stone, fixtures, and lighting early so they arrive when the crew needs them, and you get the schedule in writing before work starts. You keep one point of contact from the first visit to the final walkthrough.

Planning references

Requirements can change. Confirm the current rules for the property and proposed scope before work begins.

Our work

Before & after

Kitchen renovation in Scarborough, 2025. Scope: full gut and new layout.

Before-and-after photos from our own renovation projects.

Kitchen Renovation Markham, after
Kitchen Renovation Markham, before
BeforeAfter

Drag to compare

FAQ

Frequently asked questions

Do I need a permit for a kitchen renovation in Markham?

It depends on the scope. New cabinets and counters in the same layout is a smaller job than removing a wall or moving plumbing, and the City of Markham lists wall removal and plumbing work among the jobs that need a permit. We check your plan against the city’s requirements during the estimate and handle the application.

How long does a kitchen renovation in Markham take?

Usually four to eight weeks of on-site work for a full renovation, plus design and cabinetry lead time beforehand. We confirm a realistic schedule in writing before we start.

Can you build a second kitchen for an in-law suite?

Yes, as part of a basement or in-law suite project. A suite with its own kitchen needs proper egress, sound separation, and permitted plumbing and electrical. If it becomes a self-contained second unit, the City of Markham requires two-unit houses to be registered, with both units inspected. We plan for that before the design is final.

Kitchen renovation example (illustrative photo)
Kitchen renovation example (illustrative photo)
Kitchen renovation example (illustrative photo)
Kitchen renovation example (illustrative photo)

Photos without an “Our project” label are illustrative examples of finishes and layouts, not photographs of our work.

Booking estimates now

Ready to price your kitchen renovation?

Free on-site visit, a written itemized estimate, and one point of contact from the first walkthrough to the final inspection.